Municipal Infrastructure V in Fier, Vlora, Berat-Kucova, Lezhe, Shkodra


Activities:

  • Component C: Detailed Design and Tendering
    • Preparation of detailed design
    • Preparation of prequalification and tender documents for: 
      Construction of water supply and sewerage works under FIDIC Pink Book, Construction of WWTP Fier under FIDIC Yellow Book
    • Assistance to PEA in tendering and contracting

  • Component D: Supervision of Works and Supplies
    • Supervision of construction measures
    • Testing and inspection of completed works
    • Taking over

Investment measures:

  • Rehabilitation of water supply and distribution network
  • Extension of the sewerage network in Fier and Lezhe
  • Rehabilitation of pump stations; installation of a booster station
  • House connections and water meters
  • Construction of a WWTP including flood and erosion protection measures
  • Stormwater - Disaster risk reduction in Lezhe
  • Upgrade of the SCADA system
  • Country
    Albania
  • Period
    2021 - 2024
  • Financing
    KfW - Development Bank (Germany) and SECO - State Secretariat for Economic Affairs (Switzerland)
  • Consulting budget
    EUR 3.8 million
  • Investement budget
    approximately EUR 70 million
  • Partner
    Dahlem beratende Ingenieure, Germany
  • SETEC Engineering GmbH

  • Feldkirchner Straße 50
    9020 Klagenfurt, Austria

  • +43 463 5808-5

  • This email address is being protected from spambots. You need JavaScript enabled to view it.

SETEC Engineering provides customised solutions for public and private water utilities.